Epoxy resin floor coating - Knowsley, Merseyside.
One of our clients required a strong wearing finish over a screeded floor. The area was a service room behind two toilets. The block is...


Pit construction - Part one
One of our latest jobs requires us to create a 5m x 6m pit thats 410mm below the current floor level. The dimensions of the pit that...


Site Clearance - Rochdale, Manchester
A day of sorting materials and site clearance. All timber is separated from general waste and put in a separate skip ready for recycling....


Reducing ground levels - Rochdale, Manchester.
Today we have made a start in Rochdale, Manchester. Tidying an area in preparation to reduce levels. The project intends to extend a car...


Polished concrete slab, Haydock.
The day after pouring our reinforced concrete slab, we have a perfectly polished final product. Today has been spent cutting...


150m³ Concrete slab
Another successfully concrete pour! Today the team has been pouring a 150m³ slab. This is the 12th and final slab to complete there new...


Live drainage connection, Knowsley Industrial park.
Today one of our teams has made a live drainage connection. Connecting from a soon to be wet room in a new building, through a pan...


Concreting Knowsley
A good day concreting today. 28 cubic meters poured and finished by brush and trowelled edges. #Lancashire #groundwork #concrete...