Uncle Joes Mint balls, Wigan
Concrete floor overlay with a new Aco drainage channel New channel installed. A Damp proof membrane laid to prevent damp and then...
Concrete retaining wall - Haydock
Our client over the last few months has had a state of the art biomass boiler system installed into there factory which will produce...
Polished concrete slab - Newton-le-Willows
This week some of the team have been preparing a 240 meter square area for concrete. A damp proof membrane was layed and an A252 mesh...
Pit construction - Part two - Newton-le-Willows
After we had installed and secured our pan shutters, the dimensions were checked to ensure there had been no movement or mistakes. Once...
Pit construction - Part one
One of our latest jobs requires us to create a 5m x 6m pit thats 410mm below the current floor level. The dimensions of the pit that...
Polished concrete slab, Haydock.
The day after pouring our reinforced concrete slab, we have a perfectly polished final product. Today has been spent cutting...
150m³ Concrete slab
Another successfully concrete pour! Today the team has been pouring a 150m³ slab. This is the 12th and final slab to complete there new...