Polished concrete slab - Newton-le-Willows
This week some of the team have been preparing a 240 meter square area for concrete. A damp proof membrane was layed and an A252 mesh...
Pit construction - Part two - Newton-le-Willows
After we had installed and secured our pan shutters, the dimensions were checked to ensure there had been no movement or mistakes. Once...
Pit construction - Part one
One of our latest jobs requires us to create a 5m x 6m pit thats 410mm below the current floor level. The dimensions of the pit that...
Site Clearance - Rochdale, Manchester
A day of sorting materials and site clearance. All timber is separated from general waste and put in a separate skip ready for recycling....
Reducing ground levels - Rochdale, Manchester.
Today we have made a start in Rochdale, Manchester. Tidying an area in preparation to reduce levels. The project intends to extend a car...
Polished concrete slab, Haydock.
The day after pouring our reinforced concrete slab, we have a perfectly polished final product. Today has been spent cutting...
150m³ Concrete slab
Another successfully concrete pour! Today the team has been pouring a 150m³ slab. This is the 12th and final slab to complete there new...
Concreting Knowsley
A good day concreting today. 28 cubic meters poured and finished by brush and trowelled edges. #Lancashire #groundwork #concrete...