Concrete retaining wall - Haydock
Our client over the last few months has had a state of the art biomass boiler system installed into there factory which will produce...
Polished concrete slab - Newton-le-Willows
This week some of the team have been preparing a 240 meter square area for concrete. A damp proof membrane was layed and an A252 mesh...
Pit construction - Part two - Newton-le-Willows
After we had installed and secured our pan shutters, the dimensions were checked to ensure there had been no movement or mistakes. Once...
Pit construction - Part one
One of our latest jobs requires us to create a 5m x 6m pit thats 410mm below the current floor level. The dimensions of the pit that...
Site Clearance - Rochdale, Manchester
A day of sorting materials and site clearance. All timber is separated from general waste and put in a separate skip ready for recycling....
Polished concrete slab, Haydock.
The day after pouring our reinforced concrete slab, we have a perfectly polished final product. Today has been spent cutting...