Concrete retaining wall - Haydock
Our client over the last few months has had a state of the art biomass boiler system installed into there factory which will produce...
Pit construction - Part two - Newton-le-Willows
After we had installed and secured our pan shutters, the dimensions were checked to ensure there had been no movement or mistakes. Once...
Epoxy resin floor coating - Knowsley, Merseyside.
One of our clients required a strong wearing finish over a screeded floor. The area was a service room behind two toilets. The block is...
Site Clearance - Rochdale, Manchester
A day of sorting materials and site clearance. All timber is separated from general waste and put in a separate skip ready for recycling....
Live drainage connection, Knowsley Industrial park.
Today one of our teams has made a live drainage connection. Connecting from a soon to be wet room in a new building, through a pan...
Concreting Knowsley
A good day concreting today. 28 cubic meters poured and finished by brush and trowelled edges. #Lancashire #groundwork #concrete...