Live drainage connection, Knowsley Industrial park.
Today one of our teams has made a live drainage connection. Connecting from a soon to be wet room in a new building, through a pan shuttered reinforced concrete wall and then linking in to an existing man hole. Realising a few months back when casting the reinforced wall that it may be likely the building may require unforeseen services in the future. Plans are never set in stone, We inserted a piece of 9" twin wall between our pan shutters, bellow finished floor level. Taking very little time then but saving us lots of time today.